  • Essay / Access Control System: Work Breakdown Structure

    As the project manager for the installation of an Access Control System (ACS) in the college dormitory, my team will develop a statement of the project scope which will cover all necessary tasks to be accomplished, as well as a timeline for completing all tasks, of which the work for each task will be written. Say no to plagiarism. Get a tailor-made essay on “Why Violent Video Games Should Not Be Banned”? Get an Original Essay Install an access control system (ACS) in this small college dorm. The ACS will automatically unlock dormitory doors using an electronic proximity reader integrated with the existing security camera system. Perform a review of the current configuration of the installed camera system. Determine the cost/benefit of adding facial recognition software to integrate with the current security camera system. Locate proximity electronic readers and system software that will meet school security standards and work with the installed security camera system. Load and configure the operating software for the ACS. Gather all student and authorized staff information on building access into the server, to include current images. A system is up and running, configure the system settings that will need to be set, such as: allowed users, times when all users will be allowed or not allowed to access the dorm, to include daily and weekly event and user logs. Have ID cards designed for use with an electronic proximity reader for all students and authorized staff. Perform tests to ensure the ACS is functioning properly. Organize training and issue identity cards to all users. Implement the ACS We will provide support, maintenance, and review of the ACS. Work Breakdown Structure: The first step will be to use the existing plans of the college dormitory so that we can accurately place the readers at the entrance to the doors, so that they are easily accessible for attaching wiring and other hardware partner. . In step 1a we need to measure from the entrance doors to the equipment, so we know how much cable will be needed, plus some extra cable for maintenance purposes. Step 1b is where we run all the cabling from the drives to the server switch, then to the server, to the main computer and rewire the cameras to ensure it works with the new system. The second step requires us to use RJ45 crimpers to terminate all the connectors of the CAT6 cabling, then connect the cables to the server switch, then connect the switch to the server and the server to the main computer. Step 2a requires a network tester to test player connections to servers and cameras to ensure we have full connectivity and good signal strength. The third step is to turn on the server, then load Windows Server 2010 software onto the server; load software for proximity readers, facial recognition software for cameras. Step 3a is where we will configure server roles, proximity readers, and facial recognition software. The fourth step is to load all the initial student information and authorized personnel information. Step 4a, we upload all photos of students and authorized staff into the database. The fifth step is where we perform a full system run to test the drives..